Authorization for the use of cookies

You are here

Metro di Bangalore - Struttura di approccio al tunnel e switch box C e D

Metro of Bangalore - Tunnel approach structure and switch box C and D

Category:
  • Engineering
Location: Bangalore, India
Date: 2010
Status: Completed
Metro di Bangalore - Struttura di approccio al tunnel e switch box C e D

Final design for tender phase of the trough, the underground tunnel approach structure and the underground switch box C and D of the Metro of Bangalore, India. 

The structures of overall length of  about 330m, consist in open U-shaped an propped trough and an underground approach structure which are all composed mainly by retaining piles walls, prefabricated props and RC casts in place. The project includes also two underground switch boxes, 20m deep, of dimension in plan respectively 70x35x20m and 25x25x20m.

Client: Bangalore Metro Rail Corporation LTD

Consultant: Italferr S.p.A.

Sub Consultant: Coding S.r.L

Project Leader: Eng. Gianluca Albera (P.T. INEA)