Annibaliano - Parcheggio sotterraneo
Annibaliano - Underground Parking
- Engineering
Preliminary, final, detail structural design and site supervision of the underground parking close to the Annibaliano Station of the new line B1 of the Metro in Rome.
The parking of overall dimension in plan of about 110x40m, has three underground stories.The bottom-up dig excavation technique required using RC slurry walls, dug by hydromill and steel props until the base slab had been executed.The structure had been completed using prefabricated column, beam, slab and concrete casts on site.
Client: A.T.I. Salini Costruttori S.p.A. - Tecnimont S.P.A. - I.C.O.P. S.p.A.
Consultant: Tecnimont S.p.A.
Sub Consultant: Coding S.r.L.
Project Leader: Eng. Gianluca Albera (P.T. INEA)